• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    7 items found  page 1 of 1
    No. 115 - Routine Operations
    Report for Period 20 January to 26 January 2008

    Routine activities were carried out during the reporting period.

    Date: 29 Jan 2008
    No. 114 - Routine Operations
    Report for Period 13 January to 19 January 2008

    Routine activities were carried out during the reporting period.

    Date: 22 Jan 2008
    No. 93 - 4th Solar Orbit
    Report for Period 22 December 2007 to 18 January 2008

    Rosetta is continuing its 4th orbit around the Sun as part of its interplanetary journey. The spacecraft distance from the Sun will now increase to reach a maximum of ca. 2.26 AU in December 2008.

    Date: 22 Jan 2008
    Ulysses Communication Anomaly
    Early on 15 January, at the start of a routine test in preparation for the next phase of the Ulysses mission, communication with the spacecraft via the onboard X-band transmitter was lost. As a result, the Spacecraft Operations Team declared a Spacecraft Emergency in order to obtain additional ground station coverage from NASA's Deep Space Network (DSN).
    Date: 17 Jan 2008
    No. 113 - Routine Operations
    Report for Period 06 January to 12 January 2008

    Routine activities were carried out during the reporting period.

    Date: 15 Jan 2008
    No. 112 - Routine Operations
    Report for Period 30 December 2007 to 05 January 2008

    Routine activities were carried out during the reporting period.

    Date: 08 Jan 2008
    No. 111 - Routine Operations
    Report for Period 23 December to 29 December 2007

    It took several days to download the VIRTIS data stored onboard the spacecraft after the problems at Cebreros reported in the previous week.

    Date: 02 Jan 2008
     
      | 1 |   [Refine Search]
    7 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions