• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Services

    • Missions
    • Show All Missions
    • Archives
    • News Archive
    • Science Results
    • Multimedia Gallery
    • Publication Archive
    • Status Report Archive
    • Journal Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report Archive

    Search Results:

      | 1 |   [Refine Search]
    5 items found  page 1 of 1
    No. 184 - Mission Operations Report

    Report for Period 17 May to 23 May 2009

    The Venus Express spacecraft and instruments performed nominally during this week. Use of the Cebreros ground station was required during the launch and early orbit phase (LEOP) of the Herschel and Planck missions, which were launched on 14 May. This has had an impact on a few communication passes for Venus Express that are performed daily with the Cebreros ground station.

    Date: 27 May 2009
    No. 183 - Mission Operations Report

    Report for Period 10 May to 16 May 2009

    The Venus Express spacecraft and instruments performed nominally during this week. The dual launch of Herschel and Planck on 14 May required the use of the Cebreros ground station for spacecraft communications during the missions' launch and early orbit phase. This has had an impact on a few communication passes for Venus Express, which are performed daily with the Cebreros ground station, shortening them by 2-3 hours.

    Date: 20 May 2009
    No. 182 - Mission Operations Report

    Report for Period 3 May to 9 May 2009

    The Venus Express spacecraft and instruments performed nominally during this week. The dual launch of Herschel and Planck on 14 May has an impact on the Cebreros ground station passes, shortening them by 2-3 hours during about 10 days.

    Date: 13 May 2009
    No. 113 - Near Sun Hibernation Mode

    Report for Period 4 April to 1 May 2009

    The reporting period covers the first four weeks of the passive cruise phase #6, which started on 2 April. During this phase the Rosetta spacecraft is configured in Near Sun Hibernation Mode (NSHM) and will remain so until beginning of September. During the reporting period the performance of the spacecraft and the ground segment have been nominal.

    Date: 07 May 2009
    No. 181 - Gravity observation campaign

    Report for Period 26 April to 2 May 2009

    The Venus Express spacecraft and instruments performed nominally during this week. An orbit control manoeuvre (OCM) was successfully carried out on 26 April (DOY 116) and the mission's seventh gravity observation campaign was completed.

    Date: 06 May 2009
     
      | 1 |   [Refine Search]
    5 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions