|
|
| No. 197 - Earth Occultation Season #7 |
Report for Period 16 August to 22 August 2009 The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with two observations carried out in this reporting period. |
| Date: 26 Aug 2009 |
|
|
| No. 117 - Passive Cruise Phase |
Report for Period 25 July to 21 August 2009
The reporting period covers four weeks in the passive cruise phase #6, which started on 2 April. During this phase the Rosetta spacecraft is configured in Near Sun Hibernation Mode (NSHM) and will remain so until beginning of September. During the reporting period the performance of the spacecraft and the ground segment have been nominal. |
| Date: 25 Aug 2009 |
|
|
| No. 196 - Earth Occultation Season #7 |
Report for Period 9 August to 15 August 2009
The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with two observations carried out in this reporting period. On DOY 224 the regular DDOR measurements were performed. |
| Date: 19 Aug 2009 |
|
|
| No. 195 - Earth Occultation Season #7 |
Report for Period 2 August to 8 August 2009 The Venus Express spacecraft and instruments performed nominally during this week. The seventh Earth occultation season is ongoing, with three observations carried out in this reporting period. |
| Date: 12 Aug 2009 |
|
|
| No. 194 - Earth Occultation Season #7 |
Report for Period 26 July to 1 August 2009 The Venus Express spacecraft and instruments performed nominally during this week.
The seventh Earth occultation season is ongoing, with three observations performed in this reporting period. An orbit control manoeuvre (OCM) was carried out in the night of 25-26 July between 23:06 and 02:07 UT. This manoeuvre constitutes a phase correction to keep the phasing of Venus Express in its orbit in sync with mission operations from ground. |
| Date: 05 Aug 2009 |
|
|
| No. 116 - Passive Cruise Phase |
Report for Period 27 June to 24 July 2009 The reporting period covers four weeks in the passive cruise phase #6, which started on 2 April. During this phase the Rosetta spacecraft is configured in Near Sun Hibernation Mode (NSHM) and will remain so until beginning of September. During the reporting period the performance of the spacecraft and the ground segment have been nominal. |
| Date: 03 Aug 2009 |
|
|