• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Cluster

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Background Science
    • Earth's Magnetic Field
    • Plasma Regions
    • Solar Wind
    • Energetic Particles
    • Space Weather
    • Science Results
    • Highlights
    • Refereed Publications
    • Spacecraft…

      • Spacecraft
      • 3D Model
      • Instruments
      • Engineering
    • Mission Operations…

      • Mission Operations
      • Launch Vehicle
      • Launch Campaign
      • Orbit/Navigation
      • Mission Timeline
      • Status Reports
    • Science Operations
    • Science Operations
    • Guest Investigator Operations
    • JSOC
    • CSDS
    • Cluster Active Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report archive

    Search Results:

      | 1 |   [Refine Search]
    16 items found  page 1 of 1
    Cluster Status Report - January 2009

    Mission Operations

    The tilt of Cluster 3 (45° with respect to Cluster 4) has been successfully performed in May 2008. This allowed the 3D electric field to be measured for the first time by combining both spacecraft measurements. Preliminary results show the successful measurement of parallel electric fields in the auroral zone. The tilt also improved significantly the localization of the sources of radio waves in the magnetosphere.

    Date: 02 Feb 2009
    Cluster Status Report - March 2008
    Mission Status

    The recent long eclipse season - the most critical period of the Cluster mission since the launch in 2000 - has been passed successfully.

    Date: 18 Mar 2008
    Cluster Status Report - November 2007
    Mission Status

    Constellation manoeuvres were finished on 4 July. C3 and C4 were put at 17 km from each other, their closest separation distance in the Cluster lifetime. This constellation will allow investigating very small plasma structures in the tail of the magnetosphere.

    Date: 08 Nov 2007
    Cluster Status Report - May 2007
    Mission status

    The four spacecraft and instruments are operating nominally. The short eclipse season has been passed successively. This year the eclipse period was 1.5 month long with a total of 50 eclipses. A cycling of batteries was introduced by ESOC to give a rest to some batteries in the middle of eclipse season.

    Date: 23 May 2007
    Cluster Status Report - November 2006
    Mission Status

    All four spacecraft successfully went through the long eclipse season which has just finished. A new mode of operation called "decoder only", where the on-board computer and all other sub-systems are switched off, was defined on spacecraft 1 since the batteries are now very weak. This spacecraft came out successfully of the eclipse and was re-configured by the ESOC flight control team.

    Date: 10 Nov 2006
    Cluster Status Report - May 2006
    Mission Status

    The four spacecraft and instruments are operating nominally. The short eclipse season has just finished and a few anomalies have been observed due to the aging of the batteries. These have proven, however, that the spacecraft can survive a short eclipse with minimum power in the batteries and it will give some experience for the next long eclipses in September 2006.

    Date: 22 May 2006
    Cluster Status Report - February 2006
    Mission Status

    The four spacecraft and instruments are operating nominally. The phasing manoeuvres were executed in November 2005. The spacecraft multi-scale configuration (C1, C2 and C3 spacecraft separated by 10 000 km and C3 and C4 separated by 1000 km) was changed to a perfect tetrahedron of 10 000 km to observe the polar cusp in February/March 2006. The solid state recorder capacity was increased from 5 to 7.5 Gbit by switching on the 3rd memory module. This will allow more flexibility in the data.

    Date: 15 Feb 2006
    Cluster Status Report - November 2005
    Mission Status

    The four spacecraft and instruments are operating nominally. The largest constellation manoeuvres ever performed with Cluster were successfully executed in June-July 2005. The spacecraft reached the largest separation distance of 10 000 km through a series of the most complex manoeuvres ever done with 49 individual manoeuvres executed over a total of 21 hours of thrusters firing. The spacecraft are now in a multi-scale configuration with 3 spacecraft (C1, C2, C3) at 10 000 km and 2 spacecraft (C3, C4) at 1000 km.

    Date: 28 Nov 2005
    Cluster Status Report - April 2005
    Mission Status

    The four spacecraft and instruments are operating nominally. The short eclipse (less than 1 hour) season has been passed successfully. On spacecraft 1, one of the two batteries had a voltage drop about 3 minutes before the end of the eclipse and the second battery was not powerful enough to keep the spacecraft and instruments working. A switch over from the main on-board computer to the redundant one triggered and all instruments were switched off. After re-configuring the spacecraft, the instruments were successfully switched back on. To prevent this problem from happening again, a third battery was brought on line on each of the four spacecraft.

    Date: 09 May 2005
    Cluster Status Reports - February 2005
    Mission Status

    The spacecraft and instruments are operating nominally. An anomaly on one of the CIS (ion) detectors has been observed on spacecraft-2. The problem seems to be on the MCP high voltage. Further investigation is on-going. Ion measurements are being performed on this spacecraft by the second CIS detector. An on-board computer switch-over from main to redundant occurred on 18 October on spacecraft-4 and on 31 October on spacecraft-3. This was due to an error in the computer memory most likely due to energetic particles. The spacecraft and payload were reconfigured with success a few days later.

    Date: 10 Mar 2005
    Cluster Status Report - November 2004
    Mission Status

    The spacecraft and instruments are operating nominally. In connection with the Perseid meteor shower in August 2004, the electron instrument PEACE on C3 detected anomalously high counts and one of the sensors (HEEA) was automatically switched off. It was later switched back on and is presently working nominally.

    Date: 29 Nov 2004
    Cluster Status Report - May 2004
    Mission status

    Cluster is now in its 4th year of operations and the four spacecraft and instruments are working nominally. The data return was, on average, 99.7 % in March 2004 and April 2004. The VILSPA-1 and Maspalomas ground stations are operating nominally. The spacecraft will be moved away from each other from a starting distance of 250 km to a final one of 1000 km. At the same time, the argument of perigee will be brought down to compensate the natural drift. This means that four long manoeuvres, around 1 hour and 20 minutes, and 11 small ones (less than 5 minutes) will be executed on each spacecraft.

    Date: 24 May 2004
    Cluster Status Report - February 2004
    We are just starting the fourth year of Cluster operations. The spacecraft are working nominally and the instruments are returning data as expected from the Master Science Plan. The data return was, on average, 99.6 % between September and December 2003. The VILSPA-1 and Maspalomas ground stations are operating nominally. The separation distance between the spacecraft is now 250 km to investigate the small structures and measure the electric current at the magnetopause and bow shock.
    Date: 03 Feb 2004
    Cluster Status Report - October 2003
    The spacecraft are working nominally and the instruments are returning data as expected from the Master Science Plan. The data return was, on average, 99.3 % between May and Aug 03. The VILSPA-1 and Maspalomas ground stations are operating nominally. The 4 th spacecraft constellation manoeuvres have been successfully executed by ESOC in June- July 2003. The separation distance between the spacecraft is now 200 km to investigate the small structures and measure the electric current in the magnetotail.
    Date: 13 Oct 2003
    Cluster Status Report - April 2003
    The spacecraft are working nominally and the instruments are returning data as expected by the Master Science Plan. The data return is on average 99.8 % since February 2003 and 99.4 % since September 2002. The VILSPA-1 and Maspalomas ground stations are operating nominally. Telemetry fluctuations are seen sporadically but the data return is not affected. The spacecraft separation is now 5000 km and it will be decreased to 200 km during the fourth constellation manoeuvres in June 2003.
    Date: 18 Apr 2003
    Cluster Status Report - February 2003
    The spacecraft are working nominally and the instruments are returning data as expected by the Master Science Plan. Since 15 Sept 2002 the Maspalomas station has been used to return data over 100% of the orbit. However the full testing of Maspalomas and training of personnel could not be completed before the switch-over from Redu and therefore many problems were encountered. In addition telemetry fluctuations was frequently observed with Maspalomas, the origin being attributed to ionospheric scintillations occurring during the autumn. These fluctuations continued up to the end of December. All data were returned using VILSPA 2 and with the excellent work of the ESOC flight control team. The spacecraft separation is now 5000 km and it will be decreased to 200 km during the fourth constellation manoeuvres in June 2003.
    Date: 03 Feb 2003
     
      | 1 |   [Refine Search]
    16 items found  page 1 of 1
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions