• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • Rosetta

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Mission Team
    • Orbit View
    • Background Science
    • 67P/C-G
    • (2867) Steins
    • (21) Lutetia
    • Asteroids
    • Map of Lutetia
    • Orbiter
    • 3D Model
    • Instruments
    • Engineering
    • Lander
    • Instruments
    • Mission Operations
    • Mission Operations
    • Launch Vehicle
    • 2nd Rosetta Launch Campaign
    • Launch Information
    • ESOC Info
    • Science Operations
    • RSOC
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Status Report Archive
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Status Report archive

    Search Results:

    ‹   | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |   [Refine Search]
    166 items found  page 9 of 9
    No. 6 - Ongoing Commissioning Activities

    Report for week 26 March to 2 April

    Payload commissioning activities continued in the reporting period. The Radio Science Instrument (RSI) commissioning covered the first four passes, followed by the initial activation and commissioning of the MIRO instrument.

    Date: 05 Apr 2004
    No. 5 - Latest on Rosetta commissioning

    Report for week 19 to 26 March

    Payload commissioning activities continued in the reporting period. Three instruments were activated for the first time, ROSINA, ALICE and VIRTIS, and their first slot of commissioning activities successfully completed.

    Date: 26 Mar 2004
    No. 4 - Spacecraft Commissioning Continues

    Report for week 12 to 19 March

    Since the last status report there have been two major areas of commissioning activity: for the first five days the focus was on the lander; followed later by the various plasma detection packages on the orbiter.

    Date: 24 Mar 2004
    No. 3 - Initial Commissioning Activities

    Summary

    In the reporting period the Rosetta control at ESOC has been moved to the Dedicated Control Room, ground coverage has been reduced to a single ground station (New Norcia, covering about 12 hours per day) and spacecraft and payload commissioning activities have begun.

    Date: 15 Mar 2004
    No. 2 - Activating Rosetta

    Summary

    The spacecraft and ground segment continue to operate well. All activities planned for the initial, critical phase after launch have been successfully completed ahead of schedule. In the early morning of 5 March the Mission Control Team at ESOC has moved from the Main Control Room to the Rosetta Dedicated Control Room to commence the spacecraft and payload commissioning.

    Date: 08 Mar 2004
    No. 1 - Rosetta in Good Health

    Launch Summary

    Ariane 5 Flight 158 lifted off right on-schedule at 07:17:51 UTC on 2 March carrying with it the Rosetta spacecraft on the start of its 10 year journey to comet Churyumov-Gerasimenko.

    Date: 04 Mar 2004
     
    ‹   | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 |   [Refine Search]
    166 items found  page 9 of 9
     


    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions