• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • SMART-1

    • Missions
    • Show All Missions
    • Mission Home
    • Summary
    • Fact Sheet
    • Objectives
    • Mission Team
    • Orbit View
    • Presentations
    • Background Science
    • Electric Spacecraft Propulsion
    • Moon
    • Spacecraft
    • 3D Model
    • Instruments
    • Mission Operations
    • Launch Vehicle
    • SMART-1 Launch Campaign
    • Launch Phase
    • Lunar Capture
    • Lunar Orbit
    • Lunar Impact
    • Status Reports
    • Mission Background
    • Science Operations
    • Data Archive
    • Resources
    • News Archive
    • Multimedia Gallery
    • Publication Archive
    • Calendar of Events
    • Services
    • Contact Us
    • Subscribe
    • Terms and Conditions
    • Bookmark and Share

    Fuelling SMART-1 and hand over to Arianespace

    30 Jul 2003 18:00

    Building S5B, CSG, French Guiana

    Following the successful completion of various electrical tests, the hydrazine fuelling process took place on Monday 28th July. Hydrazine, which serves as the propellant for the attitude control system, is a highly toxic fuel and the loading procedure requires a high degree of care and attention. This is the last fuelling stage for the spacecraft. The 82 kg of Xenon, necessary to fuel the electric propulsion engine, was loaded at ESTEC, before shipment to Kourou.

    SMART-1 requires a small amount of hydrazine, about 8 kg, but the toxicity of the fuel and the complexity of the operation mean technicians must apply the same precautions for fuelling large spacecraft. The picture shows two technicians from Alcatel Space Cannes busy with the fuelling operations in the hazardous facility S5B at CSG.

    Fortunately there were no problems and the hydrazine was successfully loaded. Subsequently the spacecraft was weighed and its flight mass confirmed as 366.5 kg.

    Hydrazine Fueling

    Mated to the Launcher Adapter

    Since then SMART-1 has been powered up, to verify proper electrical functioning, and mated onto the launcher adapter. This is the interface with the launch vehicle and everything was checked with great care, for, in the case of a separation system malfunction, SMART-1 would not be able to activate its systems. SMART-1 will now remain mated to the adapter until in orbit separation.

    With all checks complete the spacecraft was handed over to Arianespace. They will transport it inside a special container, the CCU, to the final assembly facility (BAF) where the assembling of the V162 launcher with its precious cargo will take place.

    Upcoming Milestones

    28 July - Hydrazine Loading
    29 July - Hand over to the Arianespace and CSG personnel.
    31 July - Spacecraft Launch Readiness Review
    14 August - Simulation of the 4th orbit (ESOC)

    Launch delay - new schedule
    17 September - SMART-1 and adapter mated on the launcher
    22 September- Fairing integration with INSAT
    23 September- Upper composite completed to launcher
    24 September - Launch vehicle filling
    24 September- Dress Rehearsal
    25 September- Launch readiness review
    26 September - Launcher moved to launch pad
    27 September - at 23:04 GMT launch of V162 (A516)

    Launch Campaign Team


    Last Update: 29 Mar 2004

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=33610
    • Images and Videos
    • Hydrazine Fueling
    • SMART-1 Mated to Launch Adapter
    • Journal
    • Archives
    • See also
    • Launch
    • 27 September
    • 26 September
    • 22 September
    • 18 September
    • 17 September
    • 12 August - part II
    • 12 August
    • 28 - 30 July
    • SMART-1 Launch Campaign

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions