• → European Space Agency

    • About Science & Technology

    • For Public

    • For Educators

    • ESA

    • Science & Technology

    • SMART-1 Lunar Impact

    • Missions
    • Show All Missions
    • Lunar Impact
    • Impact Schedule - 01 September
    • Impact Science
    • Observing the Moon around Impact
    • SMART-1 Impact Site Visibility from Earth
    • Participating Observatories
    • News
    • Results from Observations
    • SMART-1 Mission
    • Pre-Launch
    • Launch
    • Earth Bound
    • Moon Bound
    • Status Reports
    • SMART-1 Links
    • ESA Portal
    • SciTech
    • AMIE Camera
    • SPEDE
    • D-CIXS
    • Swedish Space Corporation
    • Bookmark and Share

    Moon Operations

    On 15 November 2004, SMART-1 was captured by the Moon's gravity and experienced its first perilune. The initial lunar orbit was highly elliptical and over the next three months the apolune was lowered and the orbit circularised for final operations. This page lists the key events during SMART-1's lunar operational lifetime.

    15 November 2004 - SMART-1 enters lunar orbit

    News: SMART-1 enters lunar orbit

    10 February 2005 - SMART-1 Mission Extension Approved

    News: SMART-1 Mission Extension Approved

    February-May 2005 - Lunar commissioning after reaching operational orbit

    From capture orbit to operational orbit

    On 27 February, one year and five months after launch from Kourou, SMART-1 entered its operational orbit around the Moon. The ion engine was switched off and the lunar commissioning of the instruments was performed over the next three months.

    Status Report: No. 35 - Final Lunar Orbit & Instrument Lunar Commissioning
    Status Report: No. 36 - Ongoing Lunar Commissioning
    Status Report: No. 39 - SMART-1 Ready for Operations Phase


    Lunar Science Highlights

    Crater Glushko

    Rima Hadley

    North polar region

    Mons Gruithuisen

    Crater Atlas

    Mare Humorum Basin

    August-September 2005 - First re-boost phase

    The nominal science mission of SMART-1 was completed end of July 2005. From 2 August to 17 September 2005 the ion engine was fired repeatedly, consuming all remaining fuel to re-boost SMART-1's orbit and reach the mission extension orbit as endorsed by the SPC in February 2005.

    Status Report: No. 42 - Ion Drive Restarted

    17 September 2005 - End of ion engine operations

    Status Report: No. 43 - End of Electric Propulsion Operations   

    June 2006 - Second re-boost phase

    To allow optimal observations of the lunar impact with some of the world's largest telescopes, SMART-1's impact point was adjusted by extending the mission by three weeks. To achieve this extension, the orbit needed a second re-boost.

    As the ion engine was no longer available for providing thrust, another method was adopted to increase the spacecraft's velocity and boost the orbit, using only the attitude thrusters of the AOCS system in combination with a series of reaction wheel offloadings.

    Status Report: No. 52 - SMART-1 Mission Operations Until Moon Impact
    Status Report: No. 54 - Successful Perilune Raising Manoeuvres

     


    Last Update: 31 Aug 2006

    • Shortcut URL
    • http://sci.esa.int/jump.cfm?oid=39877

    Connect with us

    • RSS
    • Youtube
    • Twitter
    • Flickr
    • Google Buzz
    • Livestream
    • Subscribe
    • App Store
    • ESA Science Twitter

    Follow ESA science

    • Copyright 2000 - 2013 © European Space Agency. All rights reserved.

    • Terms and Conditions